Project Snapshot

  • Kitchen: full cabinet replacement with modern design, quartz countertops, backsplash update, and lighting improvements.
  • Flooring: refinished the entire first-floor flooring for a consistent look across the main level.
  • Guest bathroom: new drop-in tub with quartz countertop deck surfaces on both sides; toilet orientation corrected for better entry clearance.
  • Upstairs bathroom: tub-to-shower conversion with relocated drain and water supply; toilet relocated for improved function; lighting adjustments.

Project Overview

Brooke and Andrew wanted a clean, modern refresh focused on function and long-term durability. The work prioritized the spaces that impact daily life the most: an updated kitchen with a full cabinet replacement and improved lighting, refinished first-floor flooring to unify the main level, a guest bathroom refresh featuring a built-in drop-in tub with quartz deck surfaces, and an upstairs bathroom conversion from tub to shower with plumbing and fixture relocation.

Existing Conditions

  • Kitchen: dated cabinetry and finishes; recessed lighting placement did not support key task areas.
  • First floor: flooring finish was worn and inconsistent across main living spaces.
  • Guest bathroom: needed a functional refresh and better entry layout; toilet orientation created an awkward door interaction.
  • Upstairs bathroom: tub layout no longer fit the client's needs and required plumbing changes for a proper shower conversion and improved fixture placement.

Scope of Work

  • Kitchen Update
  • Removed existing kitchen cabinets and installed a full new cabinet set with a modern profile.
  • Installed quartz countertops (standard mid to high-grade material selection).
  • Updated backsplash tile and coordinated finish transitions.
  • Updated kitchen electrical, including recessed light relocation to improve task lighting.
  • First Floor Flooring
  • Refinished the entire first-floor flooring for a consistent appearance throughout the main level.
  • Guest Bathroom Renovation
  • Installed a new drop-in tub.
  • Built quartz countertop deck surfaces on both sides of the tub for a clean built-in look.
  • Adjusted toilet orientation so entry clearance is improved and the door does not create an awkward collision point.
  • Completed lighting updates as needed to match the refreshed finishes.
  • Upstairs Bathroom Renovation
  • Converted tub to shower.
  • Relocated shower drain and water supply to match the new shower layout.
  • Relocated the toilet to improve function and spacing.
  • Completed lighting updates as needed to support the updated configuration.

Key Challenges

  • Phasing and coordination to keep the home as functional as possible during construction.
  • Accurate plumbing relocation for the tub-to-shower conversion, including correct drain placement and supply routing.
  • Improving tight clearances in the guest bath by correcting the toilet orientation.
  • Clean finish detailing at transitions between cabinetry, quartz surfaces, tile, and existing trim elements.

Solutions and Work Performed by NBE LLC

  • Kitchen
  • Executed full cabinet replacement and coordinated installation for a modern, clean profile.
  • Installed quartz countertops and backsplash tile for a brighter, more current finish.
  • Relocated recessed lighting to improve illumination over primary work zones.
  • First Floor Flooring
  • Completed full refinishing across the first floor for a unified look and updated tone.
  • Guest Bathroom
  • Installed a new drop-in tub and built quartz deck surfaces on both sides for a clean built-in aesthetic.
  • Corrected toilet orientation to improve comfort and entry clearance.
  • Updated lighting placement to match refreshed finishes.
  • Upstairs Bathroom
  • Converted the tub to a shower and completed plumbing relocation (drain and supplies) to support the new layout.
  • Relocated the toilet to improve overall function and spacing.
  • Updated lighting to support the new configuration and finished look.

Result

In approximately 40 days, the home received a cohesive refresh across the kitchen and both bathrooms, with the added impact of a full first-floor floor refinish. The updated kitchen now features modern cabinetry, quartz surfaces, and improved recessed lighting. The guest bathroom has a clean built-in tub and quartz deck design with improved entry clearance. The upstairs bathroom now functions better for daily use with a shower conversion supported by properly relocated plumbing and improved fixture placement.